+254 719 601 094, +254 754 273 235 TRV Centre, 11F, 3rd Parklands Avenue, Parklands, Nairobi, Kenya

Media Gallery

Site Mobilisation and Camp Set up
Site Mobilisation and Camp Set up

3-Ground Breaking with Air Drilling Rig
3-Ground Breaking with Air Drilling Rig

Surface Casing
Surface Casing

Geology sample collected during drilling of Borehole
Geology sample collected during drilling of Borehole

Drilling 8.5inch drilling inside Surface Casing
Drilling 8.5inch drilling inside Surface Casing

Plain Casing
Plain Casing

6 Inch Permanant Casing Installation
6 Inch Permanant Casing Installation

Casing Installation
Casing Installation

Water Splashing
Water Splashing

Borehole Development by High Pressure Air
Borehole Development by High Pressure Air

Capping
Capping

Test Pumping
Test Pumping

Test Pumping
Test Pumping

Mud drilling - Borehole Development
Mud drilling - Borehole Development

Mud Drilling Set up and work in Progress
Mud Drilling Set up and work in Progress

Mud drilling
Mud drilling

Water trough for cattle
Water trough for cattle

Water strikes
Water strikes

Previous Next
Close
Test Caption
Test Description goes like this